Skip to content
IMTEX
SOL Brand Solutions · Bengaluru

Machine Tool Stand Builder for IMTEX in Bengaluru

Stands for the Bangalore International Exhibition Centre, 21–27 January 2027 — built at our Mumbai workshop and installed by our own crew. Engineered around what a running machine tool actually demands: floor loading, three-phase power, coolant and swarf containment, and a rigging slot for a machine that lands late.

₹1.8 lakh+From
TurnkeyStands
10+ YrsIndia
4.9★Google
Browse Designs
SOL Brand Solutions exhibition stand for a machine tool exhibitor at BIEC Bengaluru
21–27 January 2027Show Dates
BIEC, BengaluruVenue
Biennial, AlternatingCycle
~1,200Exhibitors
IMTMAOrganiser
Since 1969History
Event Overview

IMTEX — Everything You Need to Know

IMTEX is India’s flagship metal cutting exhibition and the largest machine tool show in South and South-East Asia. It is the heaviest floor we build on in Bengaluru.

IMTEX — At a Glance

Dates
21–27 January 2027 (Thursday to Wednesday) — a seven-day run, longer than most Indian trade fairs
Venue
Bangalore International Exhibition Centre (BIEC), Tumkur Road, Bengaluru
Cycle
Biennial and alternating — IMTEX metal cutting in odd years, IMTEX FORMING in even years. 2027 is metal cutting; the next is 2029
Exhibitors
Around 1,200 across machine tools, cutting tools, metrology, automation and tooling systems
Visitors
Roughly 1,50,000 trade visitors — production engineers, plant heads, job-shop owners, tooling buyers and MSME manufacturers
Organiser
Indian Machine Tool Manufacturers’ Association (IMTMA)
Alongside
Tooltech, the co-located cutting tools and tooling systems exhibition, plus a seminar programme
Freight from Mumbai
Approximately 985 km by road — one long domestic leg, no customs, no border

Why Exhibitors Choose SOL for IMTEX

This is a load-bearing build before it is a design build. A VMC, a CNC turning centre, a grinding machine or a press is not a display object — it is a machine with a crated weight, a point load under each foot, a three-phase supply, and in most cases coolant, air and a plan for where the swarf goes. Those numbers set the stand out before any styling decision becomes available, and the exhibitors who struggle at IMTEX are the ones who signed off a rendering and then discovered what their machine weighs.

We build at BIEC repeatedly across the year and know how the venue’s ordering routine behaves under deadline. The stand is assembled and inspected on our own floor in Mumbai, photographed for approval, then driven roughly 985 km south. That is a real freight leg rather than a local delivery, so the convoy is timed to the marshalling window and nothing is assembled for the first time on the show floor.

One structural point worth planning around: IMTEX alternates. Metal cutting runs in odd years and IMTEX FORMING in even years, so a structure commissioned for January 2027 does not see this floor again until January 2029 unless you also exhibit at the forming edition. That two-year gap changes the arithmetic on whether you buy a reusable system frame and store it, or build once and write it off.

What you sign is one quote. There is no second invoice arriving three weeks after the show closes. GST applies as per prevailing rates.

From Our Project Managers

What We’ve Learned Building on the IMTEX Floor

Practical notes from the SOL Brand Solutions team — the things the exhibitor manual does not tell you.

SN

Floor Loading Is the First Number We Ask For

Not the last. A mid-size machining centre puts its entire mass through four small pads, and a point load will punch through a standard raised platform that would happily carry the same total weight spread flat. We need the crated weight, the operating weight, the footprint and the foot positions before the design is drawn, because the answer decides whether you get a raised floor at all. Where the load is high we set the machine position directly onto the hall floor and step the platform around it — which reads as deliberate if it was planned and as a mistake if it was not.

Coolant and Swarf Are Design Problems, Not Housekeeping

Almost everyone plans the three-phase supply. Fewer plan for what comes out of the machine. A live cutting demonstration produces swarf and coolant mist, and both need somewhere to go: a chip tray with real capacity, bunding or drip containment under the machine, and access to clear it between runs without dismantling the stand around it. A demo switched off on day three because nobody can clean it is an expensive silence on a seven-day show.

Seven Days Changes the Staffing and the Build Spec

IMTEX runs a full week — longer than most Indian fairs and considerably longer than the three-day shows most exhibitors are used to. Two things follow. Staff rotation has to be planned properly, because the team that works days one to three will not be sharp on day six. And the build specification has to survive a week of traffic: flooring, edges and demonstration areas that look fine after three days can look tired after seven.

Order Power Against a Declared Load, Early

Power at BIEC is sanctioned through the appointed electrical contractor against a declared load, and the deadline falls well before build-up. Machine tools draw seriously, and a spindle under load draws differently from a spindle idling. We file the declared load on the day a contract is signed, with the machine’s real draw rather than a nameplate guess, because a supply ordered short cannot be fixed on the morning of day one.

The Machine Goes In First and Arrives Last

Heavy exhibits are delivered late in build-up and need forklift or crane access, so the build sequence runs backwards from the usual: floor and machine position first, machine in and levelled, then walls close around it. If the structure is complete before the machine arrives, you are taking an elevation apart to get the unit in. We agree the goods-gate slot and access route with BIEC at design stage and keep one elevation demountable.

Tooltech Traffic Is a Different Buyer — Design for Both

Tooltech runs co-located, and a substantial share of visitors cross between the two floors. Your aisle carries machine buyers making a capital decision and tooling buyers making a consumables decision, and they need different things: one wants to watch the machine cut and then sit down, the other wants to inspect an insert and talk price and availability. A stand that serves only the capital conversation loses the tooling traffic walking past it.

The Cut Part Is the Argument

Buyers judge a machine tool by what comes off it. A finished sample part — held, measured, its surface finish inspected under decent light — proves cycle time, accuracy and repeatability in a way no specification panel does. We give sample parts prominent, well-lit display beside the running machine rather than treating them as leftovers on a counter, and we design the display so a visitor can pick a part up.

FR Certificate and Fire NOC Are Filed, Not Assumed

Every material on an Indian show floor needs fire-retardancy certification, and the fire NOC has to be filed before move-in, not produced when someone asks for it. Where the build goes two-storey — common for exhibitors who want meetings above the machine — a structural stability certificate from a licensed engineer is required as well. We file all three as a matter of course, because a stand held at the gate on day minus-one is not a paperwork problem, it is a show problem.

Transparent Pricing

What an IMTEX Stand Actually Costs

Pricing on this floor follows the engineering rather than the styling. A stand carrying a running machine, a reinforced floor position and a services cluster costs more to build than the same area holding literature and a counter, and that is the honest driver behind the brackets below.

Essential — 9–18 m²

From ₹1.8 lakh
Best for: tooling, metrology, component and instrumentation suppliers, distributors and first-time IMTEX exhibitors
  • Modular aluminium system frame
  • Backlit fabric back wall, full height
  • One branded reception counter
  • Standard LED top-rail lighting
  • Bench space for a benchtop instrument or sample-part display
  • Graphics design and print (two revision rounds)
  • Mumbai → Bengaluru road freight
  • Installation, dismantling and organiser paperwork

Not included: reinforced machine platform, three-phase power and coolant orders, enclosed meeting room.

Premium — 50–100+ m²

From ₹12 lakh
Best for: full-line machine tool manufacturers, exhibitors running several machines, brands treating IMTEX as their flagship
  • Architectural custom build, optional double-decker
  • Multiple enclosed meeting rooms
  • Heavy-load flooring engineered for packaged machine tools
  • Several machine positions with independent services
  • Extraction, containment or a closed demo cell for live cutting
  • Hanging sign where the hall permits
  • Technical back-of-house, cleaning access and storage
  • Structural stability certificate from a licensed engineer
  • Priority workshop build slot

Not included: floor space rental, rigging and crane fees, AV hire beyond the package, catering.

Recent Builds

Stands We Have Built

Stands delivered across Indian trade fairs, including repeat builds at BIEC Bengaluru.

A Guide to IMTEX for First-Time Exhibitors

IMTEX is India’s flagship exhibition for metal cutting machine tools, and the 2027 edition runs 21–27 January at the Bangalore International Exhibition Centre. It is organised by the Indian Machine Tool Manufacturers’ Association, runs alongside Tooltech, and expects around 1,200 exhibitors and roughly 1,50,000 trade visitors across seven days.

Two things about the cycle change how you should plan. The first is that IMTEX alternates — metal cutting in odd years, IMTEX FORMING in even years — so 2027 is metal cutting and the next metal cutting edition is 2029. The second is the seven-day run, which is longer than most Indian trade fairs and has real consequences for staffing and for how robustly the stand is specified.

Who Exhibits and What Visitors Actually Want

The floor covers metal cutting machine tools, CNC turning and machining centres, grinding, EDM, cutting tools and tooling systems, metrology and inspection, automation and robotics, and the software and services around them. Tooltech, running co-located, concentrates the cutting tools and tooling systems side.

The visitor is a production engineer, a plant or production manager, a job-shop owner or a tooling buyer. They arrive with a specific problem — a cycle time that will not come down, a tolerance that drifts across a batch, a setup that eats hours between jobs — and they want to see the machine, watch it cut, hold the part that came off it, and ask what happens at year four. That is why so much of this floor runs live equipment, and why the engineering decisions on your stand matter more here than the graphic ones.

Stand Size: Choosing Between 9, 18, 24 and 48 Square Metres

Nine square metres works for tooling, metrology, components and services — anything whose product is benchtop-sized or is essentially a specification. You get a counter, a back wall and standing conversations. What you cannot do at this size is run a floor-standing machine with circulation around it.

Eighteen square metres suits suppliers who need a real display and a proper conversation, and it is the largest footprint we would attempt without a dedicated machine position.

Twenty-four is the threshold at which a running machine becomes practical: enough floor for a reinforced position, the services cluster, swarf and coolant containment, and a route that lets visitors walk around the unit rather than past it. If you intend to demonstrate anything that cuts, treat 24 m² as the working minimum.

At 48 m² you can carry two machine positions and still hold a private conversation, which matters when a plant head wants to discuss a project rather than a product. From 80 m² upward a double-decker adds meeting capacity without consuming the ground-floor area that heavy machines need — and on this floor ground-floor area is exactly what is scarce.

What an IMTEX Stand Costs by Size

Ranges below are all-in for design, fabrication, graphics, road freight from Mumbai, install and dismantle. They exclude the floor space rental you pay IMTMA, and the power and utility orders placed with the venue’s appointed contractors. GST applies as per prevailing rates.

  • 9 m² modular: ₹1.8–3.2 lakh
  • 18 m² modular: ₹2.6–4.4 lakh
  • 24 m² custom with one reinforced machine position: ₹4.5–7.0 lakh
  • 30 m² custom with enclosed meeting room: ₹6.5–9.0 lakh
  • 48 m² custom with two machine positions: ₹9.0–14.0 lakh
  • 80 m² premium or double-decker: ₹12.0–22.0 lakh

Common Mistakes, in Order of Frequency

The most common is designing the stand around a rendering and supplying the machine weight afterwards, so the platform is re-engineered or abandoned in build-up week. The second is declaring a nameplate power figure rather than the machine’s real draw under load, then finding the supply short on day one. The third is planning a live cutting demonstration without planning for swarf, coolant containment or cleaning access, so the machine is switched off by day three. The fourth is specifying a build for a three-day show when IMTEX runs seven, so flooring and demonstration areas look tired by the closing weekend. The fifth is finishing the structure before the machine is delivered, which means removing an elevation to get the unit in. The sixth is designing only for the capital buyer and ignoring the Tooltech tooling traffic crossing the same aisle. All six are settled at design stage or not at all.

Getting Started

Send your stand size, your hall and stand number if IMTMA has issued it, and the machine list — crated and operating weight, footprint, foot positions, real power draw under load, and whether the unit needs coolant, air or water. Those figures change the design more than anything else you can tell us. You get a 3D design and an itemised all-in quote, at no charge and with no obligation.

Because IMTEX metal cutting takes two years off after 2027, a reusable system frame makes particular sense here — the structure sits in our Mumbai warehouse between editions and the next show costs a graphics refresh rather than a rebuild. It also serves IMTEX FORMING in 2028 if you exhibit at both. Our modular exhibition stands are built for exactly that pattern.

FAQ

IMTEX — Frequently Asked Questions

Real answers with real numbers. Click any question to expand.

When and where is IMTEX 2027?

IMTEX 2027 runs 21–27 January 2027 at the Bangalore International Exhibition Centre (BIEC), Bengaluru, organised by IMTMA. Expect around 1,200 exhibitors and roughly 1,50,000 trade visitors across the seven days, with Tooltech co-located.

Is IMTEX held every year?

No. IMTEX alternates on a biennial cycle: metal cutting in odd years, IMTEX FORMING in even years. So 2027 is metal cutting, 2028 is forming, and the next metal cutting edition after 2027 is 2029. That two-year gap matters when you decide whether to build a reusable structure or a one-off.

How much does an IMTEX stand cost?

From about ₹1.8 lakh to around ₹22 lakh depending on size and engineering. A modular 18 m² sits in the ₹2.6–4.4 lakh range. A 24 m² custom stand with one reinforced machine position is typically ₹4.5–7 lakh. A 48 m² with two machine positions runs ₹9–14 lakh. Premium and double-decker builds from 80 m² start around ₹12 lakh. All figures are all-inclusive of design, fabrication, graphics, freight, install and dismantle.

What is not included in the price?

Three things. The floor space rental, which is between you and IMTMA. Power, water, compressed air and rigging orders placed with the venue and its appointed contractors. And specialty add-ons — AV beyond the listed package, furniture beyond the standard set, catering, and staffing during the show. GST applies as per prevailing rates.

Can the stand carry a heavy machine tool?

Yes, and it is the normal case here. What we need first is the crated weight, the operating weight, the footprint and the foot positions. Point loads matter more than total mass: a machine putting its weight through four small pads can punch through a platform that would carry the same load spread flat. Where the load is high we build the machine position directly onto the hall floor and step the platform around it.

How do you handle coolant and swarf from a live demonstration?

By designing for it rather than improvising. Depending on the operation that means a chip tray with real capacity, bunding or drip containment under the machine, and a removable panel so the unit can be cleared between runs without dismantling the stand. On a seven-day show this matters more than on a three-day one.

Do you handle the three-phase power order?

Yes. Power at BIEC is sanctioned through the appointed electrical contractor against a declared load, and we file it on the day a contract is signed. We declare the machine’s real draw under load rather than a nameplate figure, because a supply ordered short cannot be corrected on the morning of day one.

Do you handle the FR certificate and fire NOC?

Yes, as a matter of course. Every material is fire-retardant treated with certification, and the fire NOC is filed before move-in rather than produced when someone asks. Where the build goes two-storey we also file a structural stability certificate from a licensed engineer.

Is there customs to pay on the stand?

No. Bengaluru is domestic for us — we build in Mumbai and drive roughly 985 km south, so there is no customs file and no border on the stand itself. Machinery you import from outside India is a separate matter and stays with you or your freight forwarder.

Which hall will I be in?

Hall and stand allocation is set by IMTMA. We design to your confirmed stand number rather than to a previous edition, and we check the hall’s floor load limit against your machine before the platform is specified.

How long does install take?

A modular 9–18 m² stand goes up in one shift. A 24–48 m² custom stand with a machine position takes one to two days plus commissioning time for the equipment. Premium builds use the full window. Every stand is pre-assembled and inspected at our Mumbai workshop first, so what happens at BIEC is assembly rather than problem-solving.

When does my machine need to arrive?

Late in build-up, and that is fine — but it has to be sequenced. The floor and machine position go in first, the machine lands and is levelled, then the walls close around it. If the structure is finished before delivery we are taking an elevation apart to get the unit in. We agree the goods-gate slot with BIEC at design stage and keep one elevation demountable.

Does the seven-day run change anything?

Yes, two things. Staffing needs proper rotation — the team that works days one to three will not be sharp on day six. And the build specification has to survive a week of traffic, so flooring, edges and demonstration areas are specified more robustly than they would be for a three-day fair.

Should we design for Tooltech visitors as well?

Worth planning for. Tooltech is co-located and a substantial share of visitors cross between the two floors, so your aisle carries capital machine buyers and tooling and consumables buyers at once. They want different things — one to watch the machine cut and then sit down, the other to inspect an insert and talk price and availability. We design a path for both rather than only the capital conversation.

When do I need to lock the design?

For a show in late January, early December is comfortable. But the services orders bind earlier than the design does, and the machine data binds earlier still — we need weights, footprints and real power draw well before the design is final, because they decide what the design can be.

Can I reuse the stand at the next edition?

Yes, if it is built on a system frame. We store the structure at our Mumbai facility and refresh the graphics. Note the next metal cutting edition is 2029, so that is a two-year storage commitment unless you also exhibit at IMTEX FORMING in 2028 — worth deciding at the outset rather than after the show.

Can you handle a rush build?

Usually, for the structure. What cannot be rushed is the venue services order — power and utilities have fixed deadlines and no builder can move them. That is the single reason to start an IMTEX stand earlier than you would an ordinary show.

Can I visit during pre-build?

Yes, and we encourage it where machinery is involved. Our workshop is in Mumbai. You see the stand assembled, check the machine position and service points against your unit’s real dimensions, and meet the crew who will be at BIEC.

What graphics files do you need?

Vector files for logos and certification marks, and high-resolution raster images at roughly 150 dpi at final print size. For technical drawings and process schematics, send the source file rather than an export — they reproduce badly when scaled up from a screen-resolution image.

How many staff should I plan for?

On 18 m², two to three per shift. On 24 m² with a running machine, three to four — someone has to stay with the equipment while another works the aisle. At 48 m² and above, five or more. And because IMTEX runs seven days, plan rotation rather than the same team throughout.

Do you build at other Bengaluru shows?

Yes — across the BIEC circuit through the year. Same crew, same route from Mumbai. If you exhibit at more than one Bengaluru show in a year we plan them together, which usually means one structure and two graphics sets rather than two builds.

How do I start?

Send your stand size, hall position if you have it, and the machine list including weights, footprint, foot positions and real power draw. You get a 3D design and a full itemised quote back, at no charge.

Ready to Exhibit

Get Your IMTEX Stand Design in 48 Hours

Free 3D rendering before contract. One all-inclusive quote with no hidden line items — with the floor loading, three-phase power, coolant containment and swarf handling all resolved before the design is drawn.

48hrFree 3D Design
₹1.8 lakh+All-Inclusive
28 daysTo Show Floor
WhatsApp us
WhatsApp us